For your next project,
think Mud Bay Drilling.

EXXON / Mobil WCCLNG Tuck Inlet Prince Rupert, BC

Marine Terminal – Prince Rupert, BC

ATV Sonic positioned on Vancouver Pile Driving Barge.

  • Ten boreholes 10 – 80 m into mudline
  • Continuous sonic soil sampling

Port Mann Water Tunnel – Surrey, BC

ATV Sonic drill rig and support unit operating from a pile supported platform in the Fraser River. Installation of twelve 3” diameter copper/steel freeze tubes positioned within 0.6 m of front of tunnel boring machine (TBM)

Rio Tinto Alcan

Marine Terminal – Kitimat, BC

Fraste XL mud rotary / SCPT soils investigation.

22 locations on inter tidal area requiring the placement of temporary elevated platforms for conducting mud rotary drilling, sampling and install testing programs to 60 m below mudline


Remediation Technologies Symposium 2016

Come visit Mud Bay Drilling's booth to learn more about how we…

Tunneling Association of Canada 2016 Annual Conference

Want to learn more about what Mud Bay Drilling can offer? Stop…

GeoVancouver Conference 2016

Come visit Mud Bay Drilling at booth 300 during the 69th Canadian…


Mud Bay Drilling is an exceptional place to create and build a very rewarding career in the drilling industry. Drilling is unlike anything else you can imagine.

ISN logo
PICS logo
BC Ground Water logo
BCEIA logo
VGS logo
AMEBC logo